Atomic Plumbing
Heating & Plumbing Engineer

Atomic Plumbing

Click here to edit subtitle

Terms

Atomic Plumbing terms & conditions


The statutory rights of the buyer are not affected.


'The Company' means Atomic Plumbing.
'The goods' means the goods offered for sale by the company.


Estimates and prices quoted are valid for 28 days from the date of the estimate.

Delivery dates and times given are in good faith but are estimates only.


For the avoidance of doubt the company shall not be liable for damages whatsoever whether direct or consequential resulting from any delay in delivery of the goods whether such delay is caused by the Company's negligence or otherwise.


Any money owing to be paid upon completion. Interest will be charged on any overdue money owed under the terms of Late Payment of Debts (interest) Act 1998 amended by European directive 2000/35/EC we are entitled to levy interest and/or late payment compensation on overdue debts.


Complete and Final Payment is due upon receipt of Invoice. 


If Full Payment is not received you hereby agree that Atomic Plumbing can come to the property and remove all goods and services even if you have paid part payment and we are not liable for this action. You are responsible in non-payment and indemnify us of any legal action. Should access be required we will notify the local Police that you have agreed in these Terms to us removing all Goods previously fitted, and that we are not responsible for any damage to you or your property in doing so whilst you are in non payment of outstanding balance. The cost of removing Goods shall be added to the Invoice.


Cheques to be made payable to "Atomic Plumbing"


The goods fixed or unfixed remain the property of the Company until paid for in full.


No goods are to be removed from the Customer's premises unless paid for in full without the Company's permission.


The risk in the goods shall pass to the buyer upon delivery or collection.


It is the responsibility of the customer to remove and protect any items that could be damaged when work is being carried out by the company.


No responsibility is taken for any existing pipework, fittings, controls, components or wiring that are/is defective or found to be defective.

Floor coverings to be removed and replaced by the customer. If the Company has to remove and replace floor coverings, the Company accepts no responsibility for any damage or incorrect refitting.


The price specified does not include the price of removing any dangerous waste material such as asbestos found when installing your central heating. This will be subject to an extra charge by a 3rd party.


If you are a tenant or leaseholder, you may need your landlords permission to carry out the work covered by this estimate. Atomic Plumbing will assume that you have obtained such permission. Atomic Plumbing shall not have any liability for any loss or damage arising from failure to obtain such permission.


Where Atomic Plumbing needs to connect new equipment to your existing central heating system, it shall not be liable for any breakdown or poor performance of, or damage caused to your existing system as a result of faulty pipework or some other defect or malfunction of your central heating system. Further, Atomic Plumbing cannot accept liability for any deterioration in the performance of the central heating system caused by fluctuations in the water pressure provided by your water supplier.


Whilst working above, or adjacent to conservatories, porches, or lean-to's, Atomic Plumbing will not accept any responsibility for any damage which may occur while this work is being carried out. It is the customer's responsibility to either remove a section of the roof or protect the roof by a suitable method.


The customer's right to possession of goods for which payment has not been received shall cease and the Company can enter upon any premises and repossess the same.


The Company reserves the right at any time and without explanation to:
(a) Refuse to accept an order
(b) Cancel an order.


No goods may be returned without the Company's consent.


If an appliance cannot be fitted for any reason, Atomic Plumbing will refund your deposit less minimum 15% restocking charge.


Owing to the nature of the work, equipment and materials will be on the customer's premises. Whilst every effort will be made to keep this at a minimum, Atomic Plumbing will not be held responsible for any accidents resulting from persons not taking due care.

Atomic Plumbing may need to use sub-contractors for a job. Each sub-contractor is approved by Atomic Plumbing to ensure high standards of work. 


No responsibility will be accepted for damage to concealed pipework or electrics under floors or in walls when chases or drilling are being carried out.


The customer agrees that there will not be any other tradespersons working in the property at the same time as Atomic Plumbing.

Cancelled orders will be subject to a re-stocking charge.